Business Daily from THE HINDU group of publications
Saturday, November 7, 2009
ePaper | Mobile/PDA Version | Audio | Blogs

News
Features
Stocks
Cross Currency
Shipping
Archives
Google

Subscription

Group Sites

Update at 1405 hrs (IST)


General
Chandrayaan-II mission to be completed by 2012-13

BANGALORE: Chandrayaan-II moon mission, which will help in analysis of mineral composition and undertake terrain mapping of the moon, will be completed by 2012-13, the Project Director of Chandrayaan, Dr M. Annadurai, said on Saturday.

“The Rs 425-crore project will be completed by 2012-13. As opposed to Chandrayaan-1 which was a moon orbiter, in Chandrayaan-2, the two moon rovers will actually land on the moon surface,’’ he said inaugurating the sixth National Student Conference at Un iversity Visveswaraya College of Engineering.

“Chadrayaan-II will consist of the spacecraft and a landing platform with two moon rovers, one from India and one from Russia, which will land on the moon and move on wheels on the lunar surface, pick up samples of soil or rocks, do a chemical analysis a nd send the data to the spacecraft orbiting above,’’ Dr Annadurai said.

He said the Chardrayaan-I which was the 70th satellite to go on the moon “created history with discovery of water there (moon)’’.

“The Rs 386-crore project (Chandrayaan-I) which took four-and-a-half years to be completed has provided 6 terabits of data which will take the scientists three years to mull over,’’ he said. — PTI

Prev: Menthol prices up on fresh buying
Next: Crop insurance scheme launched in Puducherry


Business Line | NUS Index |




The Hindu Group: Home | About Us | Copyright | Archives | Contacts | Subscription
Group Sites: The Hindu | Business Line | Sportstar | Frontline | The Hindu eBooks | The Hindu Images | Home |

Copyright copy; 2009, The Hindu Business Line. Republication or redissemination of the contents of this screen are expressly prohibited without the written consent of The Hindu Business Line