Logistics

ICF to roll out engine-less ‘train-18’ soon

PTI Chennai | Updated on April 25, 2018 Published on April 25, 2018

Production of the high-speed ’engine-less’ Train-18 embellished with a host of amenities for passengers is underway and its roll out is expected soon, an Integral Coach Factory official said today.

Driven by a self propulsion module sans a separate locomotive, the train, capable of running at a speed of 160 kmph, comes with technical features for enhanced quick acceleration.

Train-18 features

With its swanky interiors and exteriors, fibre glass reinforced plastic nose cone, it resembles European semi-high speed trains.

The indigenously built train, with a seating capacity of 1,128 passengers in 16 coaches/chair cars, comes with super-comfortable seating, automatic doors, vacuum toilets, space for wheel chairs and disabled friendly restrooms.

In a presentation to the media on the train’s production process, ICF Deputy Chief Mechanical Engineer Dileep said the trains come with latest generation bogies for better riding comfort.

It has diffused lighting, automatic doors and footsteps besides GPS-based Passenger Information System.

The footstep in a coach’s doorway slides outward when the train stops at a station enabling the passengers to alight safely with comfort in view of the variation in height between a train’s floor and the platform.

The train has a wheel mounted brake disc which enables halting the train in a jiffy.

Currently, two “train sets,” are scheduled to be produced in the current year (2018-19) and the first unit’s roll out is expected by July, the official said.

A train set means an integrated, complete set of individual coaches and in the case of Train-18 it features an assembly of 16 coaches or chair cars.

Production performance

ICF manufactured 2,503 coaches of 68 variants during 2017-18.

During the current year, ICF is planning to manufacture 3299 coaches of 74 variants varying from Meter Guage Niligiri Mountain Rail to Kolkata Metro.

The making of Antyodaya, Tejas, EMUs and Train sets as well makes ICF a “versatile coach builder,” the official said.

Train-20

As regards the proposed Train-20, it is being conceived with aluminium car body with 20 cars, sleeper coaches and its production is on the cards, he said.

The first train set is expected to be out by 2020, the official added.

Published on April 25, 2018

A letter from the Editor


Dear Readers,

The coronavirus crisis has changed the world completely in the last few months. All of us have been locked into our homes, economic activity has come to a near standstill.

In these difficult times, we, at BusinessLine, are trying our best to ensure the newspaper reaches your hands every day. You can also access BusinessLine in the e-paper format – just as it appears in print. Our website and apps too, are updated every minute.

But all this comes at a heavy cost. As you are aware, the lockdowns have wiped out almost all our entire revenue stream. That we have managed so far is thanks to your support. I thank all our subscribers – print and digital – for your support.

I appeal to all our readers to help us navigate these challenging times and help sustain one of the truly independent and credible voices in the world of Indian journalism. You can help us by subscribing to our digital or e-paper editions. We offer several affordable subscription plans for our website, which includes Portfolio, our investment advisory section.

Our subscriptions start as low as Rs 199/- per month. A yearly package costs just Rs. 999 – a mere Rs 2.75 per day, less than a third the price of a cup of roadside chai..

A little help from you can make a huge difference to the cause of quality journalism!

Support Quality Journalism
This article is closed for comments.
Please Email the Editor