Tata Power commissions world’s largest solar rooftop project on a cricket stadium

Our Bureau Updated - August 30, 2018 at 12:42 PM.

Tata Power has commissioned a 820.8kWh solar project in the Cricket Club of India, Mumbai. The project was completed in 100 days. The installation of the solar rooftop project will help save 25 per cent of power consumption cost.

At present, on average (apart from stadium flood lights, which run on DG), the stadium consumes 4 lakh kWh /month, but with the solar installation, average consumption from the grid would fall to approximately 3 lakhs kWh/month. CCI will also be able to curb the emission of over 840 tonnes of carbon dioxide annually.

Published on August 30, 2018 07:12