IL&FS Engineering and Construction Company Limited has commissioned Halol Godhra Dahod Pipeline Project in Gujarat.
At 2.10 pm, the stock was up 3.92 per cent or Rs 3.25 at Rs 86.20 on the BSE.
The project included laying 103 km high pressure gas transmission pipeline on an EPC basis for Gujarat State Petronet Limited (GSPL), according to IL&FS Engineering statement.
The pipeline network constitutes a main gas trunk line which takes gas from existing despatch station of Padmala–Halol pipeline at Halol to receiving station at Dahod in Gujarat. GSPL has developed this infrastructure to cater to the customers in East Gujarat region.
This pipeline project passes through wet and dry cultivated fields, rocky terrains, and forest zones which includes major crossing through rivers, canals, roads and railways.
IL&FS Engineering Services is currently executing an EPC contract from Indian Strategic Petroleum Reserves Limited (ISPRL), Ministry of Petroleum and Natural Gas, that involves laying of pipeline from Mangalore Port to Mangalore/Padur Cavern for storage of crude oil project.
Comments
Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.
We have migrated to a new commenting platform. If you are already a registered user of TheHindu Businessline and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.