Economy

BGR Energy bags Rs 36.61-cr order

PTI Chennai | Updated on March 08, 2011




The Chennai based BGR Energy Systems has bagged turnkey contract by Power Grid Corporation of India for installation of optic fibre ground wire (OFGW) at a cost of Rs 36.61 crore. The Electrical Projects Division of the company has bagged the project which includes replacing of Unified Load Dispatch Centre microwave links by installing optic fibre ground wire on the existing transmission structures in Karnataka, Kerala, Andhra Pradesh and Puducherry.

The Rs 36.61-crore project is expected to be completed in 18 months, the company's Electrical Projects Division CEO and President, Mr V. Balakrishnan, said in a statement. “We are emerging as a leader in providing total communications solutions on power lines segment in India. Including this order for 1,575 kms, the OFGW length installed by BGR on turnkey basis would have crossed 6,000 kms,” he said.

Published on March 08, 2011

Follow us on Telegram, Facebook, Twitter, Instagram, YouTube and Linkedin. You can also download our Android App or IOS App.

This article is closed for comments.
Please Email the Editor