BGR Energy Systems has secured two orders worth ₹324.46 crore. Its electrical projects division bagged a ₹173.47-crore order from the UP Power Transmission Corporation for supply of gas insulated switchgear. The order period is 24 months. And its environmental engineering division bagged a ₹150.99-crore order from the Chennai Metropolitan Water Supply and Sewerage Board. The contract period is nine months for construction and 36 months for O&M.

comment COMMENT NOW